West Boldon BESS Farm
West Boldon BESS Farm at West Boldon
Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- Not published by Northern Powergrid
- Status
- Accepted to connect
- Customer
- West Boldon BESS Farm
- Site name
- West Boldon BESS Farm
- Address
- West Boldon BESS Farm, WEST BOLDON, WEST BOLDON, Tyne and Wear, NE36 0BA
- Grid reference
- Easting 433820, northing 560142
- Licence area
- North East (Northern Powergrid)
- Grid supply point
- West Boldon
- Bulk supply point
- West Boldon Farm BESS
- Primary substation
- West Boldon Farm BESS Direct
- Connection voltage
- 66 kV
- Technology group
- Storage
- Energy source 1
- Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 175 MW registered
- Registered capacity
- 175 MW
- Change to maximum export capacity
- 175 MW
- Change to maximum import capacity
- 0 MW
- Flexible connection
- Yes
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- 22 Aug 2024
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 10 Oct 2025
- Tracked since
- March 2026 edition
What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?
Change history
Tracked since the March 2026 edition, across 9 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at West Boldon
GSP view14 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 330 MW: 30 MW connected, 300 MW accepted to connect.
- West Boldon (Triangular Field) BESSWest Boldon (Triangular Field) BESS, Storage, West Boldon BESS primaryAccepted63 MW
- Sunderland, Deptford Terrace, Sunderland Generation 1Sunderland, Deptford Terrace, Sunderland Generation 1, Gas and other fossil, Sunderland T1 T2 primaryConnected6 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose