QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Hylton Plantation Cancelled

Hylton Plantation at West Boldon

Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not published by Northern Powergrid
Status
Accepted to connect
Customer
Hylton Plantation
Site name
Hylton Plantation Cancelled
Address
Washington Road, Washington Road, Sunderland, Tyne and Wear, SR5 3NS
Grid reference
Easting 434416, northing 559011
Licence area
North East (Northern Powergrid)
Grid supply point
West Boldon
Bulk supply point
West Boldon
Primary substation
Nissan
Connection voltage
11 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 13.8 MW registered
Registered capacity
13.8 MW
Change to maximum export capacity
13.8 MW
Change to maximum import capacity
Not stated
Flexible connection
No
In a connection queue
Not published by Northern Powergrid
Date accepted
20 Jul 2022
Date connected
Not stated
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
12 Jan 2026
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 9 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at West Boldon

GSP view

14 other sites at this grid supply point in the November 2026 edition, 2 of them at Nissan, the same primary substation. In all, the sites here total 330 MW: 30 MW connected, 300 MW accepted to connect.

See all 14

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?