QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Tees Valley Energy Recovery

Tees Valley Energy Recovery at Norton

Northern Powergrid Embedded Capacity Register 1MW and Over, May 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not published by Northern Powergrid
Status
Accepted to connect
Customer
Tees Valley Energy Recovery
Site name
Tees Valley Energy Recovery
Address
Grangetown Prairie, Land east of John Boyle Road and west of Tees Dock, Grangetown, North Yorkshire, TS6 6TY
Grid reference
Easting 454030, northing 521256
Licence area
North East (Northern Powergrid)
Grid supply point
Norton
Bulk supply point
North Tees
Primary substation
Tees Valley Energy
Connection voltage
66 kV
Technology group
Bioenergy and waste
Energy source 1
Waste, Steam turbine (thermal power plant): 49.9 MW registered
Registered capacity
49.9 MW
Change to maximum export capacity
49.9 MW
Change to maximum import capacity
Not stated
Flexible connection
No
In a connection queue
Not published by Northern Powergrid
Date accepted
1 Jun 2021
Date connected
Not stated
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
13 Sep 2021
Tracked since
May 2026 edition

Change history

Found in the May 2026 edition only.

Another record at this location is on a separate page.

Changes to its status, capacity, technology or customer, newest first.

  • June 2026 edition
    Not found in this edition by its MPAN, grid reference or name and postcode

No changes to show: it has been found in one edition.

Also at Norton

GSP view

67 other sites at this grid supply point in the September 2026 edition, 2 of them at Tees Valley Energy, the same primary substation. In all, the sites here total 2 GW: 0.4 GW connected, 1.6 GW accepted to connect.

See all 67

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose