Tees Valley Energy Recovery
Tees Valley Additional PV at Norton
Northern Powergrid Embedded Capacity Register 1MW and Over, April 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- Not published by Northern Powergrid
- Status
- Accepted to connect
- Customer
- Tees Valley Additional PV
- Site name
- Tees Valley Energy Recovery
- Address
- Grangetown Prairie, Land east of John Boyle Road and west of Tees Dock, Grangetown, North Yorkshire, TS6 6TY
- Grid reference
- Easting 454030, northing 521256
- Licence area
- North East (Northern Powergrid)
- Grid supply point
- Norton
- Bulk supply point
- North Tees
- Primary substation
- Tees Valley Energy
- Connection voltage
- 66 kV
- Technology group
- Bioenergy and waste
- Energy source 1
- Waste, Steam turbine (thermal power plant): 5 MW registered
- Registered capacity
- 5 MW
- Change to maximum export capacity
- 5 MW
- Change to maximum import capacity
- 3.99 MW
- Flexible connection
- No
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- 26 Jun 2024
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 5 Jul 2024
- Tracked since
- April 2026 edition
Change history
Found in the April 2026 edition only.
Another record at this location is on a separate page.
Changes to its status, capacity, technology or customer, newest first.
- May 2026 editionNot found in this edition by its MPAN, grid reference or name and postcode
No changes to show: it has been found in one edition.
Also at Norton
GSP view67 other sites at this grid supply point in the September 2026 edition, 2 of them at Tees Valley Energy, the same primary substation. In all, the sites here total 2 GW: 0.4 GW connected, 1.6 GW accepted to connect.
- Tees Valley Energy RecoveryTees Valley Energy Recovery, Bioenergy and waste, Tees Valley Energy primaryAccepted49.9 MW
- Tees Valley Energy RecoveryTees Valley Additional PV, Bioenergy and waste, Tees Valley Energy primaryAccepted5 MW
- California Hybrid Solar & BESSCalifornia Hybrid Solar & BESS, Storage, California Farm Direct primaryAccepted150 MW
- West House Hybrid PV % BESSWest House Hybrid PV and BESS, Solar, West House PV primaryAccepted100.32 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose