Scrooby Road PV
Scrooby Road PV at Thurcroft
Northern Powergrid Embedded Capacity Register 1MW and Over, August 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- Not published by Northern Powergrid
- Status
- Accepted to connect
- Customer
- Scrooby Road PV
- Site name
- Scrooby Road PV
- Address
- Scrooby Road, Scrooby Road, Bircotes, North Yorkshire, DN11 8AR
- Grid reference
- Easting 463602, northing 391805
- Licence area
- Yorkshire (Northern Powergrid)
- Grid supply point
- Thurcroft
- Bulk supply point
- Thurcroft
- Primary substation
- Scrooby Road PV
- Connection voltage
- 66 kV
- Technology group
- Solar
- Energy source 1
- Solar, Photovoltaic: 30 MW registered
- Registered capacity
- 30 MW
- Change to maximum export capacity
- 30 MW
- Change to maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- 1 Jul 2022
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 8 May 2024
- Tracked since
- August 2026 edition
Change history
Found in the August 2026 edition only.
Another record at this location is on a separate page.
Changes to the details QueueWatch tracks, newest first.
- September 2026 editionNot found among this edition’s sites of 1 MW and over by its MPAN, grid reference or name and postcode
No changes to show: it has been found in one edition.
Also at Thurcroft
GSP view26 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 837 MW: 156 MW connected, 681 MW accepted to connect.
- Green Lane BESS, ThurcroftGreen Lane BESS, Thurcroft, Storage, Green Lane BESS primaryConnected49.9 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?