QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Parkcliff Farm BESS

Parkcliff Farm BESS at Thurcroft

Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not published by Northern Powergrid
Status
Accepted to connect
Customer
Parkcliff Farm BESS
Site name
Parkcliff Farm BESS
Address
Parkcliff Farm, Morthen, Rotherham, West Yorkshire, S66 0EA
Grid reference
Easting 448886, northing 390036
Licence area
Yorkshire (Northern Powergrid)
Grid supply point
Thurcroft
Bulk supply point
Parkcliff Farm BESS
Primary substation
Parkcliff Farm BESS Direct
Connection voltage
66 kV
Technology group
Storage
Energy source 1
Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 49.99 MW registered
Energy source 2
Solar, Photovoltaic: 38.6 MW registered
Registered capacity
88.59 MW
Change to maximum export capacity
88.59 MW
Change to maximum import capacity
Not stated
Flexible connection
No
In a connection queue
Not published by Northern Powergrid
Date accepted
11 Mar 2024
Date connected
Not stated
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
9 Jun 2026
Tracked since
March 2026 edition

What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?

Change history

Tracked since the March 2026 edition, across 9 editions.

Changes to the details QueueWatch tracks, newest first.

  • June 2026 edition
    Capacity changed from 49.99 MW to 88.59 MW
  • June 2026 edition
    Export capacity changed from 49.99 MW to 88.59 MW

Also at Thurcroft

GSP view

25 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 837 MW: 156 MW connected, 681 MW accepted to connect.

See all 25

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?