Green Lane BESS, Thurcroft

Green Lane BESS, Thurcroft at Thurcroft

Northern Powergrid Embedded Capacity Register 1MW and Over, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
2 Sep 2020
Status
Connected
Customer
Green Lane BESS, Thurcroft
Site name
Green Lane BESS, Thurcroft
Address
Green Lane, Energy Storage Scheme, Thurcroft, South Yorkshire, S66 9JE
Grid reference
Easting 448510, northing 389807
Licence area
Yorkshire (Northern Powergrid)
Grid supply point
Thurcroft
Bulk supply point
Thurcroft
Primary substation
Green Lane BESS
Connection voltage
66 kV
Technology group
Storage
Energy source 1
Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 49.9 MW registered
Registered capacity
49.9 MW
Maximum export capacity
49.9 MW
Maximum import capacity
Not stated
Flexible connection
No
In a connection queue
Not published by Northern Powergrid
Date accepted
3 Oct 2017
Target energisation date
Not published by Northern Powergrid
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
2394000141521
Import MPAN
2380002605694
Last updated
13 Apr 2018
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 7 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at Thurcroft

GSP view

25 other sites at this grid supply point in the September 2026 edition, 1 of them at Green Lane BESS, the same primary substation. In all, the sites here total 837 MW: 156 MW connected, 681 MW accepted to connect.

  • Green Lane BESSGreen Lane BESS, Storage, Green Lane BESS primaryAccepted49.9 MW
  • NEL Howe BESSNEL Howe BESS, Storage, Nel Howe BESS primaryAccepted99.9 MW
  • Parkcliff Farm BESSParkcliff Farm BESS, Storage, Parkcliff Farm BESS Direct primaryAccepted88.59 MW
  • NEL Green BESSNEL Green BESS, Storage, NEL Green BESS primaryAccepted85 MW
  • Common Farm BESSCommon Farm BESS, Storage, Common Solar Farm primaryAccepted49.9 MW
  • Common Solar FarmCommon Solar Farm, Solar, Common Solar Farm primaryAccepted49.9 MW
  • Maltby SolarMaltby Solar, Solar, Maltby Colliery primaryAccepted41.04 MW
  • Kiveton Park 40.0MW BESSKiveton Park 40.0MW BESS, Storage, Kiveton Park PS Direct primaryAccepted40 MW

See all 25

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose