QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

RSPB Saltholme

Saltholme Gas North at Saltholme

Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
29 Jan 2021
Status
Connected
Customer
Saltholme Gas North
Site name
RSPB Saltholme
Address
RSPB Saltholme, Cowpen Bewley Road, Billingham, County Durham, TS23 4EX
Grid reference
Easting 448863, northing 523086
Licence area
North East (Northern Powergrid)
Grid supply point
Saltholme
Bulk supply point
Saltholme Gas North
Primary substation
Saltholme Gas North Direct
Connection voltage
132 kV
Technology group
Gas and other fossil
Energy source 1
Fossil - Gas, Engine (combustion / reciprocating): 49.95 MW registered
Registered capacity
49.95 MW
Maximum export capacity
49.95 MW
Maximum import capacity
Not stated
Flexible connection
No
In a connection queue
Not published by Northern Powergrid
Date accepted
20 Nov 2018
Target energisation date
Not published by Northern Powergrid
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
1574200335241
Import MPAN
1580001713590
Last updated
18 Nov 2019
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 9 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at Saltholme

GSP view

13 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 584 MW: 333 MW connected, 251 MW accepted to connect.

See all 13

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?