Port of Immingham Development
Port of Immingham Development at Grimsby West
Northern Powergrid Embedded Capacity Register 1MW and Over, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 17 May 2018
- Status
- Connected
- Customer
- Port of Immingham Development
- Site name
- Port of Immingham Development
- Address
- Immingham Development, Queens Road, Immingham, Lincolnshire, DN40 1QN
- Grid reference
- Easting 520059, northing 414869
- Licence area
- Yorkshire (Northern Powergrid)
- Grid supply point
- Grimsby West
- Bulk supply point
- Immingham
- Primary substation
- Queens Road
- Connection voltage
- 33 kV
- Technology group
- Gas and other fossil
- Energy source 1
- Fossil - Gas, Engine (combustion / reciprocating): 16.5 MW registered
- Registered capacity
- 16.5 MW
- Maximum export capacity
- 16.5 MW
- Maximum import capacity
- 0.332 MW
- Flexible connection
- No
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- 30 Jun 2017
- Target energisation date
- Not published by Northern Powergrid
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- 2394000136976
- Import MPAN
- 2380002478973
- Last updated
- 11 Sep 2024
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 7 editions.
Changes to its status, capacity, technology or customer, newest first.
No change to its status, capacity, technology or customer.
Also at Grimsby West
GSP view45 other sites at this grid supply point in the September 2026 edition, 4 of them at Queens Road, the same primary substation. In all, the sites here total 1.8 GW: 0.5 GW connected, 1.3 GW accepted to connect.
- Immingham Docks Additional WindImmingham Docks Additional Wind, Wind, Queens Road primaryAccepted17 MW
- Immingham Docks Additional PVImmingham Docks Additional PV, Solar, Queens Road primaryAccepted3.2 MW
- Synthomer, South Marsh RoadSynthomer, South Marsh Road, Gas and other fossil, Queens Road primaryConnected2.375 MW
- Little Becks Solar, Wind and StorageLittle Becks Solar, Wind and Storage, Solar, Little Becks Hybrid Direct primaryAccepted299.7 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose