Little Becks Solar, Wind and Storage

Little Becks Solar, Wind and Storage at Grimsby West

Northern Powergrid Embedded Capacity Register 1MW and Over, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not published by Northern Powergrid
Status
Accepted to connect
Customer
Little Becks Solar, Wind and Storage
Site name
Little Becks Solar, Wind and Storage
Address
Land at Lopham Lane, Laceby, Grimsby, Lincolnshire, DN37 7JF
Grid reference
Easting 521153, northing 405944
Licence area
Yorkshire (Northern Powergrid)
Grid supply point
Grimsby West
Bulk supply point
Little Becks Hybrid
Primary substation
Little Becks Hybrid Direct
Connection voltage
132 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 99.9 MW registered
Energy source 2
Wind, Onshore wind turbines: 99.9 MW registered
Energy source 3
Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 99.9 MW registered, storage 399 MWh, 4 hours of storage
Registered capacity
299.7 MW
Change to maximum export capacity
299.7 MW
Change to maximum import capacity
94.905 MW
Flexible connection
Yes
In a connection queue
Not published by Northern Powergrid
Date accepted
12 Oct 2023
Date connected
Not stated
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
15 Aug 2024
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 7 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at Grimsby West

GSP view

45 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 1.8 GW: 0.5 GW connected, 1.3 GW accepted to connect.

  • Ludborough 2 PVLudborough 2 PV, Solar, Ludborough 2 PV Direct primaryAccepted180 MW
  • West Grimsby FarmWest Grimsby Farm, Solar, West Grimsby Farm Direct primaryAccepted150 MW
  • BrocklesbyBrocklesby, Solar, Brocklesby Direct primaryAccepted80 MW
  • BSB Transport BESSBSB Transport BESS, Storage, BSB BESS Direct primaryConnected80 MW
  • Europa WayNEL Immingham BESS, Storage, Immingham BESS Direct primaryAccepted80 MW
  • Netherlands Way VoltaEconergy, Storage, Eco Energy Direct primaryAccepted80 MW
  • Weelsby FarmWeelsby Farm, Solar, Weelsby Farm Direct primaryAccepted65 MW
  • Netherlands Way GasNetherlands Way Gas, Gas and other fossil, Netherlands Way Gas primaryAccepted60 MW

See all 45

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose