QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Immingham Docks Additional Wind

Immingham Docks Additional Wind at Grimsby West

Northern Powergrid Embedded Capacity Register 1MW and Over, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not published by Northern Powergrid
Status
Accepted to connect
Customer
Immingham Docks Additional Wind
Site name
Immingham Docks Additional Wind
Address
Associated British Ports, Immingham Dock, Immingham, Lincolnshire, DN40 2LZ
Grid reference
Easting 519875, northing 416226
Licence area
Yorkshire (Northern Powergrid)
Grid supply point
Grimsby West
Bulk supply point
Immingham
Primary substation
Queens Road
Connection voltage
11 kV
Technology group
Wind
Energy source 1
Wind, Onshore wind turbines: 17 MW registered
Registered capacity
17 MW
Change to maximum export capacity
17 MW
Change to maximum import capacity
23.75 MW
Flexible connection
No
In a connection queue
Not published by Northern Powergrid
Date accepted
16 Sep 2024
Date connected
Not stated
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
7 Oct 2024
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 7 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at Grimsby West

GSP view

45 other sites at this grid supply point in the September 2026 edition, 4 of them at Queens Road, the same primary substation. In all, the sites here total 1.8 GW: 0.5 GW connected, 1.3 GW accepted to connect.

See all 45

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose