QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

North Tyneside General Hospital

North Tyneside General Hospital at Tynemouth

Northern Powergrid Embedded Capacity Register 1MW and Over, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
1 Aug 1998
Status
Connected
Customer
North Tyneside General Hospital
Site name
North Tyneside General Hospital
Address
North Tyneside General Hospital, Rake Lane, North Shields, Tyne and Wear, NE29 8NH
Grid reference
Easting 434052, northing 570275
Licence area
North East (Northern Powergrid)
Grid supply point
Tynemouth
Bulk supply point
Chirton Grange
Primary substation
Billy Mill
Connection voltage
11 kV
Technology group
Other or not stated
Energy source 1
Other, Other: 2.451 MW registered
Registered capacity
2.451 MW
Maximum export capacity
2.451 MW
Maximum import capacity
Not stated
Flexible connection
No
In a connection queue
Not published by Northern Powergrid
Date accepted
Not stated
Target energisation date
Not published by Northern Powergrid
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
1594001111792
Import MPAN
Not stated
Last updated
8 Mar 2017
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 7 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at Tynemouth

GSP view

10 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 234 MW: 44 MW connected, 190 MW accepted to connect.

See all 10

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose