QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Howden Sewage Treatment Works

Howden Sewage Treatment Works at Tynemouth

Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
20 Nov 2012
Status
Connected
Customer
Howden Sewage Treatment Works
Site name
Howden Sewage Treatment Works
Address
Howden Sewage Treatment Works, Northumberland Dock, Wallsend, Tyne and Wear, NE28 0QD
Grid reference
Easting 433264, northing 566342
Licence area
North East (Northern Powergrid)
Grid supply point
Tynemouth
Bulk supply point
Flatworth
Primary substation
Howdon
Connection voltage
11 kV
Technology group
Bioenergy and waste
Energy source 1
Waste, Engine (combustion / reciprocating): 5.7 MW registered
Registered capacity
5.7 MW
Maximum export capacity
5.7 MW
Maximum import capacity
Not stated
Flexible connection
No
In a connection queue
Not published by Northern Powergrid
Date accepted
Not stated
Target energisation date
Not published by Northern Powergrid
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
1574000310618
Import MPAN
1574000310627
Last updated
8 Mar 2017
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 9 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at Tynemouth

GSP view

10 other sites at this grid supply point in the November 2026 edition, 1 of them at Howdon, the same primary substation. In all, the sites here total 234 MW: 44 MW connected, 190 MW accepted to connect.

See all 10

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?