Fenwick Pit BESS
Fenwick Pit BESS at Tynemouth
Northern Powergrid Embedded Capacity Register 1MW and Over, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- Not published by Northern Powergrid
- Status
- Accepted to connect
- Customer
- Fenwick Pit BESS
- Site name
- Fenwick Pit BESS
- Address
- Fenwick Pit B, East Holywell, Shiremoor, Tyne and Wear, NE27 0JW
- Grid reference
- Easting 431409, northing 572386
- Licence area
- North East (Northern Powergrid)
- Grid supply point
- Tynemouth
- Bulk supply point
- Fenwick Pit BESS
- Primary substation
- Fenwick Pit BESS Direct
- Connection voltage
- 132 kV
- Technology group
- Storage
- Energy source 1
- Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 50 MW registered, storage 50 MWh, 1 hours of storage
- Registered capacity
- 50 MW
- Change to maximum export capacity
- 50 MW
- Change to maximum import capacity
- 47.5 MW
- Flexible connection
- Yes
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- 30 May 2023
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 9 Apr 2025
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 7 editions.
Changes to its status, capacity, technology or customer, newest first.
No change to its status, capacity, technology or customer.
Also at Tynemouth
GSP view10 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 234 MW: 44 MW connected, 190 MW accepted to connect.
- Chirex, Dudley, CramlingtonChirex, Dudley, Cramlington, Gas and other fossil, Killingworth primaryConnected5.7 MW
- Howden Sewage Treatment WorksHowden Sewage Treatment Works, Bioenergy and waste, Howdon primaryConnected5.7 MW
- Renal & Oncology DepartmentRenal & Oncology Department, Gas and other fossil, Longbenton primaryConnected5.463 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose