Newcastle Airport
Newcastle Airport at Stella North
Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 8 Mar 2023
- Status
- Connected
- Customer
- Newcastle Airport
- Site name
- Newcastle Airport
- Address
- Newcastle Airport PV Farm, Woolsington, Newcastle Upon Tyne, Tyne and Wear, NE13 8BZ
- Grid reference
- Easting 418526, northing 571482
- Licence area
- North East (Northern Powergrid)
- Grid supply point
- Stella North
- Bulk supply point
- Blucher
- Primary substation
- Newcastle Airport
- Connection voltage
- 11 kV
- Technology group
- Solar
- Energy source 1
- Solar, Photovoltaic: 2.6 MW registered
- Registered capacity
- 2.6 MW
- Maximum export capacity
- 2.6 MW
- Maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- 30 Nov 2022
- Target energisation date
- Not published by Northern Powergrid
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- 1574200506633
- Import MPAN
- 1570000190631
- Last updated
- 9 Dec 2022
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 9 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at Stella North
GSP view14 other sites at this grid supply point in the November 2026 edition, 1 of them at Newcastle Airport, the same primary substation. In all, the sites here total 454 MW: 37 MW connected, 417 MW accepted to connect.
- Dewley Hill Hybrid BESS & SPVDewley Hill Hybrid BESS & SPV, Solar, Dewley Hill Direct primaryAccepted150 MW
- Queen Victoria Royal InfirmaryQueen Victoria Royal Infirmary, Gas and other fossil, University primaryConnected12 MW
- Royal Victoria InfirmaryRoyal Victoria Infirmary, Gas and other fossil, University primaryConnected10.925 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?