Cross Lane BESS

Cross Lane BESS at Stella North

Northern Powergrid Embedded Capacity Register 1MW and Over, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not published by Northern Powergrid
Status
Accepted to connect
Customer
Cross Lane BESS
Site name
Cross Lane BESS
Address
Cross Lane, Cross Lane, Gateshead, Tyne and Wear, NE11 9HQ
Grid reference
Easting 421783, northing 562613
Licence area
North East (Northern Powergrid)
Grid supply point
Stella North
Bulk supply point
Cross Lane BESS
Primary substation
Cross Lane BESS Direct
Connection voltage
132 kV
Technology group
Storage
Energy source 1
Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 105.6 MW registered, storage 199.8 MWh, 2 hours of storage
Registered capacity
105.6 MW
Change to maximum export capacity
105.6 MW
Change to maximum import capacity
95 MW
Flexible connection
Yes
In a connection queue
Not published by Northern Powergrid
Date accepted
25 Apr 2023
Date connected
Not stated
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
12 May 2023
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 7 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at Stella North

GSP view

14 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 454 MW: 37 MW connected, 417 MW accepted to connect.

See all 14

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose