Mill Lane Solar PV
Mill Lane Add BESS at Norton
Northern Powergrid Embedded Capacity Register 1MW and Over, April 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- Not published by Northern Powergrid
- Status
- Accepted to connect
- Customer
- Mill Lane Add BESS
- Site name
- Mill Lane Solar PV
- Address
- Mill Lane, Whitton, Stockton, County Durham, TS21 1LJ
- Grid reference
- Easting 437842, northing 522533
- Licence area
- North East (Northern Powergrid)
- Grid supply point
- Norton
- Bulk supply point
- Mill Lane
- Primary substation
- Mill Lane Direct
- Connection voltage
- 132 kV
- Technology group
- Storage
- Energy source 1
- Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 180 MW registered, storage 360 MWh, 3 hours of storage
- Registered capacity
- 180 MW
- Change to maximum export capacity
- 180 MW
- Change to maximum import capacity
- 171 MW
- Flexible connection
- No
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- 28 Jan 2025
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 6 Feb 2025
- Tracked since
- April 2026 edition
Change history
Found in the April 2026 edition only.
Another record at this location is on a separate page.
Changes to its status, capacity, technology or customer, newest first.
- May 2026 editionNot found in this edition by its MPAN, grid reference or name and postcode
No changes to show: it has been found in one edition.
Also at Norton
GSP view67 other sites at this grid supply point in the September 2026 edition, 2 of them at Mill Lane Direct, the same primary substation. In all, the sites here total 2 GW: 0.4 GW connected, 1.6 GW accepted to connect.
- California Hybrid Solar & BESSCalifornia Hybrid Solar & BESS, Storage, California Farm Direct primaryAccepted150 MW
- West House Hybrid PV % BESSWest House Hybrid PV and BESS, Solar, West House PV primaryAccepted100.32 MW
- Hell Hole & Low Middlefield FarmsHell Hole & Low Middlefield Farms, Solar, Hell Hole Farm Direct primaryAccepted80 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose