Mill Hill Farm
Mill Hill Farm at Osbaldwick
Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 2 Dec 2015
- Status
- Connected
- Customer
- Mill Hill Farm
- Site name
- Mill Hill Farm
- Address
- Mill Hill Farm, Farlington, York, North Yorkshire, YO60 6QN
- Grid reference
- Easting 462969, northing 467191
- Licence area
- North East (Northern Powergrid)
- Grid supply point
- Osbaldwick
- Bulk supply point
- Malton Grid
- Primary substation
- Sheriff Hutton
- Connection voltage
- 11 kV
- Technology group
- Solar
- Energy source 1
- Solar, Photovoltaic: 3.99 MW registered
- Registered capacity
- 3.99 MW
- Maximum export capacity
- 3.99 MW
- Maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- Not stated
- Target energisation date
- Not published by Northern Powergrid
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- 1574000323608
- Import MPAN
- Not stated
- Last updated
- 8 Mar 2017
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 9 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at Osbaldwick
GSP view30 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 1.5 GW: 0.2 GW connected, 1.3 GW accepted to connect.
- Clock and Grimeston Farm Solar & BESSClock and Grimeston Farm Solar & BESS, Storage, Clock and Grimeston Farm Direct primaryAccepted200 MW
- Sheriff Hutton 80MW HybridSheriff Hutton 80MW Hybrid, Solar, Sheriff Hutton 80MW Hybrid primaryAccepted160 MW
- Birdstall Estate HybridBirdstall Estate Hybrid, Solar, Birdstall Estate Hybrid primaryAccepted99.8 MW
- Old Malton Solar PV and BESSOld Malton Solar PV and BESS, Solar, Harmony BESS primaryAccepted61.9 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?