QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Low Farm Bradley Photovoltaics

Low Farm Bradley Photovoltaics at Grimsby West

Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
21 Apr 2023
Status
Connected
Customer
Low Farm Bradley Photovoltaics
Site name
Low Farm Bradley Photovoltaics
Address
Low Farm, Bradley, Grimsby, Lincolnshire, DN37 OAL
Grid reference
Easting 525335, northing 409323
Licence area
Yorkshire (Northern Powergrid)
Grid supply point
Grimsby West
Bulk supply point
Yarborough Road 132/33kV
Primary substation
Low Farm Bradley Solar
Connection voltage
33 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 16.3 MW registered
Registered capacity
16.3 MW
Maximum export capacity
16.3 MW
Maximum import capacity
0.078 MW
Flexible connection
No
In a connection queue
Not published by Northern Powergrid
Date accepted
1 Sep 2014
Target energisation date
Not published by Northern Powergrid
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
2394200169573
Import MPAN
2380002828286
Last updated
11 Sep 2024
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 9 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at Grimsby West

GSP view

46 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 1.8 GW: 0.5 GW connected, 1.3 GW accepted to connect.

See all 46

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?