QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Loscar Wind Farm

Loscar Wind Farm at Thurcroft

Northern Powergrid Embedded Capacity Register 1MW and Over, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
1 Oct 2010
Status
Connected
Customer
Loscar Wind Farm
Site name
Loscar Wind Farm
Address
Packman Lane, Harthill, Sheffield, South Yorkshire, S26 7XY
Grid reference
Easting 449383, northing 382220
Licence area
Yorkshire (Northern Powergrid)
Grid supply point
Thurcroft
Bulk supply point
Thurcroft
Primary substation
Kiveton Park
Connection voltage
11 kV
Technology group
Wind
Energy source 1
Wind, Onshore wind turbines: 4.5 MW registered
Registered capacity
4.5 MW
Maximum export capacity
3.8 MW
Maximum import capacity
Not stated
Flexible connection
No
In a connection queue
Not published by Northern Powergrid
Date accepted
Not stated
Target energisation date
Not published by Northern Powergrid
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
2394000064062
Import MPAN
Not stated
Last updated
8 Mar 2017
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 7 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at Thurcroft

GSP view

25 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 837 MW: 156 MW connected, 681 MW accepted to connect.

  • NEL Howe BESSNEL Howe BESS, Storage, Nel Howe BESS primaryAccepted99.9 MW
  • Parkcliff Farm BESSParkcliff Farm BESS, Storage, Parkcliff Farm BESS Direct primaryAccepted88.59 MW
  • NEL Green BESSNEL Green BESS, Storage, NEL Green BESS primaryAccepted85 MW
  • Common Farm BESSCommon Farm BESS, Storage, Common Solar Farm primaryAccepted49.9 MW
  • Common Solar FarmCommon Solar Farm, Solar, Common Solar Farm primaryAccepted49.9 MW
  • Green Lane BESSGreen Lane BESS, Storage, Green Lane BESS primaryAccepted49.9 MW
  • Green Lane BESS, ThurcroftGreen Lane BESS, Thurcroft, Storage, Green Lane BESS primaryConnected49.9 MW
  • Maltby SolarMaltby Solar, Solar, Maltby Colliery primaryAccepted41.04 MW

See all 25

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose