QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Leeds Uni/Hospital Generating Station Complex

Leeds Uni/Hospital Generating Station Complex at Kirkstall B

Northern Powergrid Embedded Capacity Register 1MW and Over, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
10 Aug 2017
Status
Connected
Customer
Leeds Uni/Hospital Generating Station Complex
Site name
Leeds Uni/Hospital Generating Station Complex
Address
Leeds Generating Station Complex, Clerendon Way, Leeds, West Yorkshire, LS2 9DA
Grid reference
Easting 427158, northing 434571
Licence area
Yorkshire (Northern Powergrid)
Grid supply point
Kirkstall B
Bulk supply point
Kirkstall C 2/5
Primary substation
University Clarendon Way
Connection voltage
33 kV
Technology group
Gas and other fossil
Energy source 1
Fossil - Gas, Steam turbine (thermal power plant): 15 MW registered
Registered capacity
15 MW
Maximum export capacity
15 MW
Maximum import capacity
Not stated
Flexible connection
No
In a connection queue
Not published by Northern Powergrid
Date accepted
Not stated
Target energisation date
Not published by Northern Powergrid
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
2394000133840
Import MPAN
2394000133831
Last updated
8 Mar 2017
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 7 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at Kirkstall B

GSP view

9 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 120 MW: 23 MW connected, 97 MW accepted to connect.

See all 9

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose