John Charles Stadium PV

John Charles Stadium PV at Kirkstall B

Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
6 Mar 2026
Status
Connected
Customer
John Charles Stadium PV
Site name
John Charles Stadium PV
Address
John Charles Stadium, Belle Isle, Leeds, West Yorkshire, LS11 5DJ
Grid reference
Easting 430194, northing 429933
Licence area
Yorkshire (Northern Powergrid)
Grid supply point
Kirkstall B
Bulk supply point
Beeston Royds 132/33kV
Primary substation
Middleton Town Street
Connection voltage
11 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 1.4 MW registered
Registered capacity
1.4 MW
Maximum export capacity
0.625 MW
Maximum import capacity
Not stated
Flexible connection
No
In a connection queue
Not published by Northern Powergrid
Date accepted
20 Jul 2023
Target energisation date
Not published by Northern Powergrid
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
2394000098586
Import MPAN
Not stated
Last updated
12 Sep 2023
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 9 editions.

Changes to the details QueueWatch tracks, newest first.

  • April 2026 edition
    Status changed from “accepted to connect” to “connected”
  • April 2026 edition
    Export capacity changed from 1.4 MW to 0.625 MW

Also at Kirkstall B

GSP view

9 other sites at this grid supply point in the November 2026 edition, 1 of them at Middleton Town Street, the same primary substation. In all, the sites here total 120 MW: 23 MW connected, 97 MW accepted to connect.

See all 9

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?