Butts Court Oil
Butts Court Oil at Kirkstall B
Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- Not published by Northern Powergrid
- Status
- Accepted to connect
- Customer
- Butts Court Oil
- Site name
- Butts Court Oil
- Address
- 14, BUTTS COURT, LEEDS, North Yorkshire, LS1 5DZ
- Grid reference
- Easting 430001, northing 433736
- Licence area
- Yorkshire (Northern Powergrid)
- Grid supply point
- Kirkstall B
- Bulk supply point
- Kirkstall C 2/5
- Primary substation
- Upper Basinghall Street
- Connection voltage
- 11 kV
- Technology group
- Gas and other fossil
- Energy source 1
- Fossil - Oil, Engine (combustion / reciprocating): 1.125 MW registered
- Registered capacity
- 1.125 MW
- Change to maximum export capacity
- 1.125 MW
- Change to maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- 20 Oct 2020
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 8 May 2024
- Tracked since
- August 2026 edition
Change history
Tracked since the August 2026 edition, across 4 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at Kirkstall B
GSP view9 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 120 MW: 23 MW connected, 97 MW accepted to connect.
- Leeds Uni/Hospital Generating Station ComplexLeeds Uni/Hospital Generating Station Complex, Gas and other fossil, University Clarendon Way primaryConnected15 MW
- Barclays Mill Shaw Court Standby GeneratorBarclays Mill Shaw Court Standby Generator, Gas and other fossil, Beeston Royds 33/11kV primaryConnected1.6 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?