QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Knauf CHP

Knauf CHP at Grimsby West

Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
26 Jun 2023
Status
Connected
Customer
Knauf CHP
Site name
Knauf CHP
Address
96, Kings Road, Immingham, West Yorkshire, DN40 1QS
Grid reference
Easting 519249, northing 415044
Licence area
Yorkshire (Northern Powergrid)
Grid supply point
Grimsby West
Bulk supply point
Immingham
Primary substation
Humber Road
Connection voltage
11 kV
Technology group
Gas and other fossil
Energy source 1
Fossil - Gas, Steam-gas turbine (CCGT): 4 MW registered
Registered capacity
4 MW
Maximum export capacity
4 MW
Maximum import capacity
Not stated
Flexible connection
No
In a connection queue
Not published by Northern Powergrid
Date accepted
26 Jun 2023
Target energisation date
Not published by Northern Powergrid
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
8 May 2024
Tracked since
August 2026 edition

Change history

Tracked since the August 2026 edition, across 4 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at Grimsby West

GSP view

46 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 1.8 GW: 0.5 GW connected, 1.3 GW accepted to connect.

See all 46

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?