Grimsby CHP

Grimsby CHP (Ex-Huntsman Tioxide) (Accepted) at Grimsby West

Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
Not stated
Status
Connected
Customer
Grimsby CHP (Ex-Huntsman Tioxide) (Accepted)
Site name
Grimsby CHP
Address
Grimsby CHP, Moody Lane, Grimsby, Lincolnshire, DN31 2SW
Grid reference
Easting 525550, northing 411314
Licence area
Yorkshire (Northern Powergrid)
Grid supply point
Grimsby West
Bulk supply point
Yarborough Road 132/33kV
Primary substation
Tioxide 1/2
Connection voltage
33 kV
Technology group
Gas and other fossil
Energy source 1
Fossil - Gas, Steam turbine (thermal power plant): 18 MW registered
Registered capacity
18 MW
Maximum export capacity
20 MW
Maximum import capacity
Not stated
Flexible connection
No
In a connection queue
Not published by Northern Powergrid
Date accepted
Not stated
Target energisation date
Not published by Northern Powergrid
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
2300000948904
Import MPAN
Not stated
Last updated
8 Mar 2017
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 9 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at Grimsby West

GSP view

46 other sites at this grid supply point in the November 2026 edition, 2 of them at Tioxide 1/2, the same primary substation. In all, the sites here total 1.8 GW: 0.5 GW connected, 1.3 GW accepted to connect.

  • Grimsby CHPGrimsby CHP (Ex-Huntsman Tioxide) (Connected), Gas and other fossil, Tioxide 1/2 primaryConnected20 MW
  • Grimsby Power StationGrimsby Power Station, Gas and other fossil, Tioxide 1/2 primaryConnected20 MW
  • Little Becks Solar, Wind and StorageLittle Becks Solar, Wind and Storage, Solar, Little Becks Hybrid Direct primaryAccepted299.7 MW
  • Ludborough 2 PVLudborough 2 PV, Solar, Ludborough 2 PV Direct primaryAccepted180 MW
  • West Grimsby FarmWest Grimsby Farm, Solar, West Grimsby Farm Direct primaryAccepted150 MW
  • BrocklesbyBrocklesby, Solar, Brocklesby Direct primaryAccepted80 MW
  • BSB Transport BESSBSB Transport BESS, Storage, BSB BESS Direct primaryConnected80 MW
  • Europa WayNEL Immingham BESS, Storage, Immingham BESS Direct primaryAccepted80 MW

See all 46

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?