Great Coates PV

Great Coates PV at Grimsby West

Northern Powergrid Embedded Capacity Register 1MW and Over, July 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not published by Northern Powergrid
Status
Accepted to connect
Customer
Great Coates PV
Site name
Great Coates PV
Address
AYLESBY ROAD, GREAT COATES, GRIMSBY, Lincolnshire, DN41 8DT
Grid reference
Easting 520732, northing 414280
Licence area
Yorkshire (Northern Powergrid)
Grid supply point
Grimsby West
Bulk supply point
Great Coates PV
Primary substation
Great Coates PV Direct
Connection voltage
132 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 49 MW registered
Registered capacity
49 MW
Change to maximum export capacity
49 MW
Change to maximum import capacity
Not stated
Flexible connection
No
In a connection queue
Not published by Northern Powergrid
Date accepted
28 Apr 2022
Date connected
Not stated
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
8 May 2024
Tracked since
March 2026 edition

Change history

Tracked from the March 2026 edition to the July 2026 edition, across 5 editions.

Another record at this location is on a separate page.

Changes to the details QueueWatch tracks, newest first.

  • August 2026 edition
    Not found among this edition’s sites of 1 MW and over by its MPAN, grid reference or name and postcode

No change to any detail QueueWatch tracks.

Also at Grimsby West

GSP view

47 other sites at this grid supply point in the November 2026 edition, 1 of them at Great Coates PV Direct, the same primary substation. In all, the sites here total 1.8 GW: 0.5 GW connected, 1.3 GW accepted to connect.

See all 47

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?