Fourstones Hybrid (Solar & BESS)
Fourstones Hybrid (Solar & BESS) at Fourstones 33kV
Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- Not published by Northern Powergrid
- Status
- Accepted to connect
- Customer
- Fourstones Hybrid (Solar & BESS)
- Site name
- Fourstones Hybrid (Solar & BESS)
- Address
- Land adjacent either side of B6319, Warden, Fourstones, Northumberland, NE46 4BH
- Grid reference
- Easting 390577, northing 569317
- Licence area
- North East (Northern Powergrid)
- Grid supply point
- Fourstones 33kV
- Bulk supply point
- Fourstones 33kV
- Primary substation
- Fourstones Hybrid
- Connection voltage
- 33 kV
- Technology group
- Storage
- Energy source 1
- Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 40 MW registered
- Energy source 2
- Solar, Photovoltaic: 40 MW registered
- Registered capacity
- 80 MW
- Change to maximum export capacity
- 80 MW
- Change to maximum import capacity
- 30.4 MW
- Flexible connection
- No
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- 9 Jun 2022
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 18 Feb 2025
- Tracked since
- March 2026 edition
What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?
Change history
Tracked since the March 2026 edition, across 9 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at Fourstones 33kV
GSP view3 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 266 MW: 74 MW connected, 192 MW accepted to connect.
- Ray Windfarm, Kirkwhelpington (Ray Fell Windfarm)Ray Windfarm, Kirkwhelpington (Ray Fell Windfarm), Wind, Ray Fell Windfarm primaryConnected54.4 MW
- Ray Wind Farm Additional BESSRay Wind Farm Additional BESS, Storage, Ray Fell Windfarm primaryConnected20 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?