Carr Edge Farm BESS
Carr Edge Farm BESS at Fourstones 33kV
Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- Not published by Northern Powergrid
- Status
- Accepted to connect
- Customer
- Carr Edge Farm BESS
- Site name
- Carr Edge Farm BESS
- Address
- Land at Carr Edge Farm, Newbrough, Hexham, Northumberland, NE47 5EA
- Grid reference
- Easting 387692, northing 569777
- Licence area
- North East (Northern Powergrid)
- Grid supply point
- Fourstones 33kV
- Bulk supply point
- Fourstones 33kV
- Primary substation
- Carr Edge Farm BESS
- Connection voltage
- 33 kV
- Technology group
- Solar
- Energy source 1
- Solar, Photovoltaic: 57 MW registered
- Energy source 2
- Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 55 MW registered
- Registered capacity
- 112 MW
- Change to maximum export capacity
- 112 MW
- Change to maximum import capacity
- Not stated
- Flexible connection
- Yes
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- 28 Nov 2023
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 15 Aug 2024
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 9 editions.
Changes to the details QueueWatch tracks, newest first.
- June 2026 editionTechnology changed from Storage to Solar
Also at Fourstones 33kV
GSP view3 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 266 MW: 74 MW connected, 192 MW accepted to connect.
- Fourstones Hybrid (Solar & BESS)Fourstones Hybrid (Solar & BESS), Storage, Fourstones Hybrid primaryAccepted80 MW
- Ray Windfarm, Kirkwhelpington (Ray Fell Windfarm)Ray Windfarm, Kirkwhelpington (Ray Fell Windfarm), Wind, Ray Fell Windfarm primaryConnected54.4 MW
- Ray Wind Farm Additional BESSRay Wind Farm Additional BESS, Storage, Ray Fell Windfarm primaryConnected20 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?