QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

East Cowton

East Cowton at Norton

Northern Powergrid Embedded Capacity Register 1MW and Over, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not published by Northern Powergrid
Status
Accepted to connect
Customer
East Cowton
Site name
East Cowton
Address
Birkby Farm, Great Smeaton, Northallerton, North Yorkshire, DL6 2HA
Grid reference
Easting 434488, northing 503451
Licence area
North East (Northern Powergrid)
Grid supply point
Norton
Bulk supply point
Darlington Central
Primary substation
Darlington East
Connection voltage
33 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 23 MW registered
Registered capacity
23 MW
Change to maximum export capacity
23 MW
Change to maximum import capacity
Not stated
Flexible connection
Yes
In a connection queue
Not published by Northern Powergrid
Date accepted
11 Feb 2022
Date connected
Not stated
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
11 May 2022
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 7 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at Norton

GSP view

66 other sites at this grid supply point in the September 2026 edition, 2 of them at Darlington East, the same primary substation. In all, the sites here total 2 GW: 0.4 GW connected, 1.6 GW accepted to connect.

See all 66

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose