Burnhills Quarry Landfill Site
Burnhills Quarry Landfill Site at Stella North
Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 30 Apr 2010
- Status
- Connected
- Customer
- Burnhills Quarry Landfill Site
- Site name
- Burnhills Quarry Landfill Site
- Address
- Burnhills Quarry Landfill Site, Barlow Road, Blaydon-On-Tyne, Tyne and Wear, NE21 6JU
- Grid reference
- Easting 415427, northing 560893
- Licence area
- North East (Northern Powergrid)
- Grid supply point
- Stella North
- Bulk supply point
- Dunston
- Primary substation
- Blaydon Burn
- Connection voltage
- 11 kV
- Technology group
- Bioenergy and waste
- Energy source 1
- Waste, Engine (combustion / reciprocating): 5.225 MW registered
- Registered capacity
- 5.225 MW
- Maximum export capacity
- 5.225 MW
- Maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- Not stated
- Target energisation date
- Not published by Northern Powergrid
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- 1574000253800
- Import MPAN
- 1574000263599
- Last updated
- 8 Mar 2017
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 9 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at Stella North
GSP view14 other sites at this grid supply point in the November 2026 edition, 2 of them at Blaydon Burn, the same primary substation. In all, the sites here total 454 MW: 37 MW connected, 417 MW accepted to connect.
- Path Head GenerationPath Head Generation, Gas and other fossil, Blaydon Burn primaryConnected2.85 MW
- Blaydon Quarry Landfill SiteBlaydon Quarry Landfill Site, Bioenergy and waste, Blaydon Burn primaryConnected2.09 MW
- Dewley Hill Hybrid BESS & SPVDewley Hill Hybrid BESS & SPV, Solar, Dewley Hill Direct primaryAccepted150 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose