QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Cow Marsh Wind Farm

Cow Marsh Wind Farm at Grimsby West

Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not published by Northern Powergrid
Status
Accepted to connect
Customer
Cow Marsh Wind Farm
Site name
Cow Marsh Wind Farm
Address
Holme Farm Cow Marsh Lane, Tetney, Grimsby, Lincolshire, DN36 5NX
Grid reference
Easting 532244, northing 401917
Licence area
Yorkshire (Northern Powergrid)
Grid supply point
Grimsby West
Bulk supply point
Humberston
Primary substation
Cow Marsh Wind Farm
Connection voltage
33 kV
Technology group
Wind
Energy source 1
Wind, Onshore wind turbines: 32 MW registered
Registered capacity
32 MW
Change to maximum export capacity
32 MW
Change to maximum import capacity
0.095 MW
Flexible connection
Yes
In a connection queue
Not published by Northern Powergrid
Date accepted
7 May 2025
Date connected
Not stated
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
4 Jun 2025
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 9 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at Grimsby West

GSP view

46 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 1.8 GW: 0.5 GW connected, 1.3 GW accepted to connect.

See all 46

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?