Constellation Cold Logistics PV

Constellation Cold Logistics PV at Grimsby West

Northern Powergrid Embedded Capacity Register 1MW and Over, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not published by Northern Powergrid
Status
Accepted to connect
Customer
Constellation Cold Logistics PV
Site name
Constellation Cold Logistics PV
Address
Constellation Cold Logistics, Estate Road 2, Grimsby, Lincolnshire, DN31 2TG
Grid reference
Easting 524615, northing 410458
Licence area
Yorkshire (Northern Powergrid)
Grid supply point
Grimsby West
Bulk supply point
Yarborough Road 132/33kV
Primary substation
Great Coates
Connection voltage
11 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 3 MW registered
Registered capacity
3 MW
Change to maximum export capacity
3 MW
Change to maximum import capacity
2.85 MW
Flexible connection
Yes
In a connection queue
Not published by Northern Powergrid
Date accepted
2 Jun 2025
Date connected
Not stated
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
7 Jul 2025
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 7 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at Grimsby West

GSP view

45 other sites at this grid supply point in the September 2026 edition, 1 of them at Great Coates, the same primary substation. In all, the sites here total 1.8 GW: 0.5 GW connected, 1.3 GW accepted to connect.

See all 45

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose