Tiverton menchine farm ad plant
Nomansland biogas limited at Exeter Main Sgp
NGED Embedded Capacity Register, August 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 11 Dec 2015
- Status
- Connected
- Customer
- Nomansland biogas limited
- Site name
- Tiverton menchine farm ad plant
- Address
- Ad Plant, Menchine Farm, Nomansland, Tiverton, Devon, EX16 8NP
- Grid reference
- Easting 283338, northing 113536
- Licence area
- South West
- Grid supply point
- Exeter Main Sgp
- Bulk supply point
- Exeter City Bsp
- Primary substation
- Witheridge
- Connection voltage
- 11 kV
- Technology group
- Bioenergy and waste
- Energy source 1
- Biofuel - Biogas from anaerobic digestion (excluding landfill & sewage), Engine (combustion / reciprocating): 2 MW registered
- Energy source 2
- 0.6 MW registered
- Energy source 3
- Solar, Photovoltaic: 0.3 MW registered
- Registered capacity
- 2.9 MW
- Maximum export capacity
- 1.805 MW
- Maximum import capacity
- 0.285 MW
- Flexible connection
- Not published by NGED
- In a connection queue
- Not published by NGED
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by NGED
- Transmission reinforcement reference
- Not published by NGED
- Export MPAN
- 2200042424768
- Import MPAN
- 2200042424759
- Last updated
- 6 Aug 2026
- Tracked since
- August 2026 edition
Change history
Tracked since the August 2026 edition, the only one QueueWatch holds so far.
Changes to its status, capacity, technology or customer, newest first.
Changes will show from the next edition.
Also at Exeter Main Sgp
GSP view63 other sites at this grid supply point in the August 2026 edition. In all, the sites here total 1.1 GW: 0.2 GW connected, 0.9 GW accepted to connect.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose