Langford 132kv solar bess
Jbm solar projects 2 ltd at Exeter Main Sgp
NGED Embedded Capacity Register, August 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 1 Jun 2025
- Status
- Connected
- Customer
- Jbm solar projects 2 ltd
- Site name
- Langford 132kv solar bess
- Address
- Langford Solar Farm, Land North-East Side Of 2 Langford Green, Langford, Cullompton, EX15 1RG
- Grid reference
- Easting 304191, northing 102882
- Licence area
- South West
- Grid supply point
- Exeter Main Sgp
- Bulk supply point
- Not stated
- Primary substation
- Not stated
- Connection voltage
- 132 kV
- Technology group
- Storage
- Energy source 1
- Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 39.51 MW registered
- Energy source 2
- Solar, Photovoltaic: 2.195 MW registered
- Registered capacity
- 41.705 MW
- Maximum export capacity
- 34.983 MW
- Maximum import capacity
- 33.25 MW
- Flexible connection
- Not published by NGED
- In a connection queue
- Not published by NGED
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by NGED
- Transmission reinforcement reference
- Not published by NGED
- Export MPAN
- 2200043841306
- Import MPAN
- 2200043841290
- Last updated
- 6 Aug 2026
- Tracked since
- August 2026 edition
What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?
Change history
Tracked since the August 2026 edition, the only one QueueWatch holds so far.
Changes to the details QueueWatch tracks, newest first.
Changes will show from the next edition.
Also at Exeter Main Sgp
GSP view63 other sites at this grid supply point in the August 2026 edition. In all, the sites here total 1.1 GW: 0.2 GW connected, 0.9 GW accepted to connect.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?