Redfern road/golden hillock road
Tyseley waste disposal ltd at Nechells East 132Kv S Stn
NGED Embedded Capacity Register, August 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 19 Apr 1996
- Status
- Connected
- Customer
- Tyseley waste disposal ltd
- Site name
- Redfern road/golden hillock road
- Address
- James Road, Tyseley, Birmingham, West Midlands, B11 2BH
- Grid reference
- Easting 411256, northing 284151
- Licence area
- West Midlands
- Grid supply point
- Nechells East 132Kv S Stn
- Bulk supply point
- Sparkbrook 132Kv S Stn
- Primary substation
- Sparkbrook 132/11Kv
- Connection voltage
- 66 kV
- Technology group
- Bioenergy and waste
- Energy source 1
- Waste, Steam turbine (thermal power plant): 35 MW registered
- Registered capacity
- 35 MW
- Maximum export capacity
- 33.25 MW
- Maximum import capacity
- Not stated
- Flexible connection
- Not published by NGED
- In a connection queue
- Not published by NGED
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by NGED
- Transmission reinforcement reference
- Not published by NGED
- Export MPAN
- 1430000005417
- Import MPAN
- Not stated
- Last updated
- 6 Aug 2026
- Tracked since
- August 2026 edition
Change history
Tracked since the August 2026 edition, the only one QueueWatch holds so far.
Changes to the details QueueWatch tracks, newest first.
Changes will show from the next edition.
Also at Nechells East 132Kv S Stn
GSP view9 other sites at this grid supply point in the August 2026 edition, 1 of them at Sparkbrook 132/11Kv, the same primary substation. In all, the sites here total 105 MW: 97 MW connected, 8 MW accepted to connect.
- Birmingham, 198 golden hillock roadMacdermid performance solutions uk ltd, Solar, Sparkbrook 132/11Kv primaryConnected2.495 MW
- Minworth stwSevern trent water limited, Bioenergy and waste, Castle Bromwich 132/11Kv primaryConnected11.889 MW
- Birmingham bio power ltdBirmingham bio power ltd, Bioenergy and waste, Boughton Road 132/11Kv primaryConnected10.3 MW
- Birmingham wharton streetMercia power response (cuckoo rd) ltd, Gas and other fossil, Nechells West 132/25/11Kv primaryConnected8 MW
- Generation sitemast energy developments, Gas and other fossil, Bordesley 132/11Kv primaryAccepted4.994 MW
- Smurfit kappa uk ltdSmurfit kappa uk ltd, Gas and other fossil, Nechells West 132/25/11Kv primaryConnected2.836 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?