Narborough landfill site, huncote road
Suez recycling and recovery uk limited at Enderby 132Kv S Stn
NGED Embedded Capacity Register, August 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 20 Mar 2006
- Status
- Connected
- Customer
- Suez recycling and recovery uk limited
- Site name
- Narborough landfill site, huncote road
- Address
- S I T A Holdings (Uk) Limited, Narborough Lodge, Huncote Road, Narborough, Leicester, Leicestershire, LE19 3RQ
- Grid reference
- Easting 452593, northing 297322
- Licence area
- East Midlands
- Grid supply point
- Enderby 132Kv S Stn
- Bulk supply point
- Wigston 33Kv S Stn
- Primary substation
- Alliance And Leicester 33 11Kv S Stn
- Connection voltage
- 0.4 kV
- Technology group
- Other or not stated
- Energy source 1
- 1.45 MW registered
- Registered capacity
- 1.45 MW
- Maximum export capacity
- 1.378 MW
- Maximum import capacity
- 0.048 MW
- Flexible connection
- Not published by NGED
- In a connection queue
- Not published by NGED
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by NGED
- Transmission reinforcement reference
- Not published by NGED
- Export MPAN
- 1100770695674
- Import MPAN
- 1100770695665
- Last updated
- 6 Aug 2026
- Tracked since
- August 2026 edition
Change history
Tracked since the August 2026 edition, the only one QueueWatch holds so far.
Changes to the details QueueWatch tracks, newest first.
Changes will show from the next edition.
Also at Enderby 132Kv S Stn
GSP view35 other sites at this grid supply point in the August 2026 edition, 2 of them at Alliance And Leicester 33 11Kv S Stn, the same primary substation. In all, the sites here total 577 MW: 197 MW connected, 380 MW accepted to connect.
- Greens lodge farm, huncote engine no 2A c shropshire ltd, Bioenergy and waste, Alliance And Leicester 33 11Kv S Stn primaryConnected2 MW
- Next enderbyLynx sustainable solutions ltd, Solar, Alliance And Leicester 33 11Kv S Stn primaryAccepted1.9 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?