QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Mary tavy generator import/export site

South west water ltd at Landulph Sgp

NGED Embedded Capacity Register, August 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
12 Apr 1996
Status
Connected
Customer
South west water ltd
Site name
Mary tavy generator import/export site
Address
The Power Station, Mary Tavy, Tavistock, Devon, PL19 9PR
Grid reference
Easting 250929, northing 78449
Licence area
South West
Grid supply point
Landulph Sgp
Bulk supply point
Ernesettle Bsp
Primary substation
Tavistock
Connection voltage
11 kV
Technology group
Hydro and marine
Energy source 1
Water (flowing water or head of water), Hydro - Run of river: 2.622 MW registered
Registered capacity
2.622 MW
Maximum export capacity
2.755 MW
Maximum import capacity
0.095 MW
Flexible connection
Not published by NGED
In a connection queue
Not published by NGED
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by NGED
Transmission reinforcement reference
Not published by NGED
Export MPAN
2200032020539
Import MPAN
2200040035025
Last updated
6 Aug 2026
Tracked since
August 2026 edition

Change history

Tracked since the August 2026 edition, the only one QueueWatch holds so far.

Changes to the details QueueWatch tracks, newest first.

Changes will show from the next edition.

Also at Landulph Sgp

GSP view

39 other sites at this grid supply point in the August 2026 edition. In all, the sites here total 644 MW: 255 MW connected, 389 MW accepted to connect.

See all 39

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?