QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Lapford 2 wind farm

Mjs grid services ltd at Exeter Main Sgp

NGED Embedded Capacity Register, August 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
5 Oct 2026
Status
Accepted to connect
Customer
Mjs grid services ltd
Site name
Lapford 2 wind farm
Address
Nymet Rowland, Coldridge, Devon, EX17 6AP
Grid reference
Easting 2712220, northing 1082000
Licence area
South West
Grid supply point
Exeter Main Sgp
Bulk supply point
Exeter City Bsp
Primary substation
Lapford
Connection voltage
11 kV
Technology group
Wind
Energy source 1
Wind, Onshore wind turbines: 4.94 MW registered
Registered capacity
4.94 MW
Change to maximum export capacity
4.94 MW
Change to maximum import capacity
0.2 MW
Flexible connection
Not published by NGED
In a connection queue
Not published by NGED
Date accepted
20 Jul 2026
Date connected
Not stated
Distribution reinforcement reference
Not published by NGED
Transmission reinforcement reference
Not published by NGED
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
6 Aug 2026
Tracked since
August 2026 edition

Change history

Tracked since the August 2026 edition, the only one QueueWatch holds so far.

Changes to its status, capacity, technology or customer, newest first.

Changes will show from the next edition.

Also at Exeter Main Sgp

GSP view

63 other sites at this grid supply point in the August 2026 edition, 1 of them at Lapford, the same primary substation. In all, the sites here total 1.1 GW: 0.2 GW connected, 0.9 GW accepted to connect.

See all 63

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose