QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Erin landfill, markham lane, chesterfield, s44 5hs

Valencia energy ltd at Chesterfield 132Kv S Stn

NGED Embedded Capacity Register, August 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
25 Jul 2005
Status
Connected
Customer
Valencia energy ltd
Site name
Erin landfill, markham lane, chesterfield, s44 5hs
Address
#NAME?, Commerce Park, Markham Lane, Duckmanton, Chesterfield, Derbyshire, S44 5HS
Grid reference
Easting 444883, northing 373145
Licence area
East Midlands
Grid supply point
Chesterfield 132Kv S Stn
Bulk supply point
Staveley 33Kv S Stn
Primary substation
Erin Road
Connection voltage
11 kV
Technology group
Bioenergy and waste
Energy source 1
Biofuel - Landfill gas, Gas turbine (OCGT): 5 MW registered
Registered capacity
5 MW
Maximum export capacity
4.75 MW
Maximum import capacity
7.125 MW
Flexible connection
Not published by NGED
In a connection queue
Not published by NGED
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by NGED
Transmission reinforcement reference
Not published by NGED
Export MPAN
1100770964035
Import MPAN
1100770963919
Last updated
6 Aug 2026
Tracked since
August 2026 edition

Change history

Tracked since the August 2026 edition, the only one QueueWatch holds so far.

Changes to the details QueueWatch tracks, newest first.

Changes will show from the next edition.

Also at Chesterfield 132Kv S Stn

GSP view

99 other sites at this grid supply point in the August 2026 edition. In all, the sites here total 1.4 GW: 0.5 GW connected, 0.9 GW accepted to connect.

See all 99

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?