Colwick sidings, colwick road no4, ad plant

Bio dynamic (uk) ltd at Stoke Bardolph 132Kv

NGED Embedded Capacity Register, August 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
1 Aug 2018
Status
Connected
Customer
Bio dynamic (uk) ltd
Site name
Colwick sidings, colwick road no4, ad plant
Address
P176, Private Road No 4, Colwick Industrial Estate, Nottingham, NG4 2JT
Grid reference
Easting 463401, northing 339827
Licence area
East Midlands
Grid supply point
Stoke Bardolph 132Kv
Bulk supply point
Nottingham East 33Kv S Stn
Primary substation
Colwick 33 11Kv S Stn
Connection voltage
11 kV
Technology group
Bioenergy and waste
Energy source 1
Biofuel - Biogas from anaerobic digestion (excluding landfill & sewage), Gas turbine (OCGT): 4.052 MW registered
Energy source 2
0.785 MW registered
Registered capacity
4.837 MW
Maximum export capacity
3.8 MW
Maximum import capacity
1.235 MW
Flexible connection
Not published by NGED
In a connection queue
Not published by NGED
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by NGED
Transmission reinforcement reference
Not published by NGED
Export MPAN
1170000304423
Import MPAN
1170000304432
Last updated
6 Aug 2026
Tracked since
August 2026 edition

Change history

Tracked since the August 2026 edition, the only one QueueWatch holds so far.

Changes to its status, capacity, technology or customer, newest first.

Changes will show from the next edition.

Also at Stoke Bardolph 132Kv

GSP view

12 other sites at this grid supply point in the August 2026 edition, 4 of them at Colwick 33 11Kv S Stn, the same primary substation. In all, the sites here total 153 MW: 63 MW connected, 90 MW accepted to connect.

See all 12

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose