Spring lane bess
Grenergy renewables uk limited at Stoke Bardolph 132Kv
NGED Embedded Capacity Register, August 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 29 Oct 2027
- Status
- Accepted to connect
- Customer
- Grenergy renewables uk limited
- Site name
- Spring lane bess
- Address
- Land South Of Spring Lane, Lambley,, Gedling, Nottinghamshire,, NG4 4PD
- Grid reference
- Easting 462144, northing 344422
NGED’s register gives it in tenths of a metre. - Licence area
- East Midlands
- Grid supply point
- Stoke Bardolph 132Kv
- Bulk supply point
- Not stated
- Primary substation
- Not stated
- Connection voltage
- 132 kV
- Technology group
- Storage
- Energy source 1
- Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 90 MW registered
- Registered capacity
- 90 MW
- Change to maximum export capacity
- 90 MW
- Change to maximum import capacity
- 90 MW
- Flexible connection
- Not published by NGED
- In a connection queue
- Not published by NGED
- Date accepted
- 27 Jun 2023
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by NGED
- Transmission reinforcement reference
- Not published by NGED
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 6 Aug 2026
- Tracked since
- August 2026 edition
What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?
Change history
Tracked since the August 2026 edition, the only one QueueWatch holds so far.
Changes to the details QueueWatch tracks, newest first.
Changes will show from the next edition.
Also at Stoke Bardolph 132Kv
GSP view12 other sites at this grid supply point in the August 2026 edition. In all, the sites here total 153 MW: 63 MW connected, 90 MW accepted to connect.
- Private road no 5Mercia power response (private road no 5) limited, Gas and other fossilConnected16 MW
- London road heat stationNottingham city council, Solar, St Anns 33 11Kv S Stn primaryConnected11.37 MW
- Stoke lane, stoke bardolphSevern trent water limited, Gas and other fossil, Colwick 33 11Kv S Stn primaryConnected6.39 MW
- 11kv generationMercia power response (private road no 5) limited, Gas and other fossil, Colwick 33 11Kv S Stn primaryConnected5.2 MW
- Colwick sidings, colwick road no4, ad plantBio dynamic (uk) ltd, Bioenergy and waste, Colwick 33 11Kv S Stn primaryConnected4.837 MW
- Former gedling collieryAlkane energy uk limited, Gas and other fossil, Gedling 33 11Kv S Stn primaryConnected3.1 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?