Acreage lane
Alkane energy uk limited at Chesterfield 132Kv S Stn
NGED Embedded Capacity Register, August 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 17 Jun 2013
- Status
- Connected
- Customer
- Alkane energy uk limited
- Site name
- Acreage lane
- Address
- Generation Site, Exp, Reclamation Site, Acreage Lane, Shirebrook, Nottinghamshire, NG20 8RN
- Grid reference
- Easting 452628, northing 366965
- Licence area
- East Midlands
- Grid supply point
- Chesterfield 132Kv S Stn
- Bulk supply point
- Mansfield 33Kv S Stn
- Primary substation
- Acreage Lane 33 11Kv S Stn
- Connection voltage
- 11 kV
- Technology group
- Gas and other fossil
- Energy source 1
- Fossil - Gas, Engine (combustion / reciprocating): 10 MW registered
- Energy source 2
- Solar, Photovoltaic: 0.05 MW registered
- Registered capacity
- 10.05 MW
- Maximum export capacity
- 9.548 MW
- Maximum import capacity
- 0.333 MW
- Flexible connection
- Not published by NGED
- In a connection queue
- Not published by NGED
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by NGED
- Transmission reinforcement reference
- Not published by NGED
- Export MPAN
- 1100050313401
- Import MPAN
- 1100050313369
- Last updated
- 6 Aug 2026
- Tracked since
- August 2026 edition
Change history
Tracked since the August 2026 edition, the only one QueueWatch holds so far.
Changes to its status, capacity, technology or customer, newest first.
Changes will show from the next edition.
Also at Chesterfield 132Kv S Stn
GSP view99 other sites at this grid supply point in the August 2026 edition, 4 of them at Acreage Lane 33 11Kv S Stn, the same primary substation. In all, the sites here total 1.4 GW: 0.5 GW connected, 0.9 GW accepted to connect.
- Shirebrook, sookholme roadMercia power response (sookholme road) ltd, Gas and other fossil, Acreage Lane 33 11Kv S Stn primaryConnected6.274 MW
- Unit c weighbridge road shirebrookThornton estate energy limited, Gas and other fossil, Acreage Lane 33 11Kv S Stn primaryConnected4 MW
- Former main collieryAlkane energy uk ltd, Other or not stated, Acreage Lane 33 11Kv S Stn primaryConnected2.7 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose