QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

WORTHINGTON HOUSE, STOTT LANE

SCA HYGIENE PRODUCTS MANCHESTER LTD at CARRINGTON ENWL SGTS 1B 2B 4 7

ENWL Embedded Capacity Register 2 – 1MW and above, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
1 Apr 1999
Status
Connected
Customer
SCA HYGIENE PRODUCTS MANCHESTER LTD
Site name
WORTHINGTON HOUSE, STOTT LANE
Address
TRAFFORD PARK ROAD, TRAFFORD PARK, MANCHESTER, GREATER MANCHESTER, M17 1EQ
Grid reference
Easting 378924, northing 397975
Licence area
North West England (ENWL)
Grid supply point
CARRINGTON ENWL SGTS 1B 2B 4 7
Bulk supply point
BARTON
Primary substation
TRAFFORD PARK NORTH
Connection voltage
11 kV
Technology group
Gas and other fossil
Energy source 1
FOSSIL - OIL, ENGINE (COMBUSTION / RECIPROCATING): 1.2 MW registered
Registered capacity
1.2 MW
Maximum export capacity
0 MW
Maximum import capacity
15.2 MW
Change to maximum import capacity
0 MW
Flexible connection
No
In a connection queue
Not stated
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by ENWL
Transmission reinforcement reference
Not stated
Export MPAN
Not stated
Import MPAN
1620000279707
Last updated
6 Dec 2021
Tracked since
May 2026 edition

Change history

Tracked since the May 2026 edition, across 2 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at CARRINGTON ENWL SGTS 1B 2B 4 7

GSP view

15 other sites at this grid supply point in the September 2026 edition, 1 of them at TRAFFORD PARK NORTH, the same primary substation. In all, the sites here total 212 MW: 156 MW connected, 56 MW accepted to connect.

See all 15

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose