SPAR DISTRIBUTION CENTRE

JAMES HALL AND COMPANY LTD at PENWORTHAM EAST GSP / ROCHDALE SGT 1 GROUP

ENWL Embedded Capacity Register 2 – 1MW and above, October 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
1 Dec 2012
Status
Connected
Customer
JAMES HALL AND COMPANY LTD
Site name
SPAR DISTRIBUTION CENTRE
Address
BOWLAND VIEW, BOWLAND VIEW, PRESTON, LANCASHIRE, PR2 5QT
Grid reference
Easting 357343, northing 432976
Licence area
North West England (ENWL)
Grid supply point
PENWORTHAM EAST GSP / ROCHDALE SGT 1 GROUP
Bulk supply point
PRESTON EAST
Primary substation
RIBBLETON
Connection voltage
6.6 kV
Technology group
Gas and other fossil
Energy source 1
FOSSIL - OIL, ENGINE (COMBUSTION / RECIPROCATING): 2.992 MW registered
Registered capacity
2.992 MW
Maximum export capacity
2.842 MW
Maximum import capacity
1.71 MW
Change to maximum import capacity
0 MW
Flexible connection
No
In a connection queue
Not stated
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by ENWL
Transmission reinforcement reference
Not stated
Export MPAN
1640000082277
Import MPAN
1640000002305
Last updated
6 Dec 2021
Tracked since
May 2026 edition

Change history

Tracked since the May 2026 edition, across 3 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at PENWORTHAM EAST GSP / ROCHDALE SGT 1 GROUP

GSP view

30 other sites at this grid supply point in the October 2026 edition. In all, the sites here total 460 MW: 317 MW connected, 143 MW accepted to connect.

See all 30

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?