QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

SALT AYRE LANDFILL

VIRIDIS ENERGY (NORGEN) LIMITED at HEYSHAM GSP

ENWL Embedded Capacity Register 2 – 1MW and above, October 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
1 Sep 2008
Status
Connected
Customer
VIRIDIS ENERGY (NORGEN) LIMITED
Site name
SALT AYRE LANDFILL
Address
OVANGLE ROAD, OVANGLE ROAD, LANCASTER, LANCASHIRE, LA1 5JR
Grid reference
Easting 345722, northing 462405
Licence area
North West England (ENWL)
Grid supply point
HEYSHAM GSP
Bulk supply point
LANCASTER
Primary substation
LANCASTER
Connection voltage
11 kV
Technology group
Bioenergy and waste
Energy source 1
BIOFUEL - LANDFILL GAS, ENGINE (COMBUSTION / RECIPROCATING): 1.15 MW registered
Registered capacity
1.15 MW
Maximum export capacity
1.092 MW
Maximum import capacity
0.038 MW
Change to maximum import capacity
0 MW
Flexible connection
No
In a connection queue
Not stated
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by ENWL
Transmission reinforcement reference
Not stated
Export MPAN
1630000016808
Import MPAN
1630000016792
Last updated
6 Dec 2021
Tracked since
May 2026 edition

Change history

Tracked since the May 2026 edition, across 3 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at HEYSHAM GSP

GSP view

29 other sites at this grid supply point in the October 2026 edition, 3 of them at LANCASTER, the same primary substation. In all, the sites here total 1.2 GW: 0.3 GW connected, 0.9 GW accepted to connect.

See all 29

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?