QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

PENNINE PLACE

WALKERS SNACK FOODS LIMITED at WASHWAY FARM GSP / KIRKBY GSP GROUP

ENWL Embedded Capacity Register 2 – 1MW and above, October 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
4 Dec 2015
Status
Connected
Customer
WALKERS SNACK FOODS LIMITED
Site name
PENNINE PLACE
Address
PENNINE PLACE, SKELMERSDALE, LANCASHIRE, WN8 9QF
Grid reference
Easting 349124, northing 404469
Licence area
North West England (ENWL)
Grid supply point
WASHWAY FARM GSP / KIRKBY GSP GROUP
Bulk supply point
SKELMERSDALE
Primary substation
PIMBO
Connection voltage
11 kV
Technology group
Wind
Energy source 1
WIND, ONSHORE WIND TURBINES: 2.3 MW registered
Registered capacity
2.3 MW
Maximum export capacity
1.425 MW
Maximum import capacity
2.85 MW
Change to maximum import capacity
0 MW
Flexible connection
No
In a connection queue
Not stated
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by ENWL
Transmission reinforcement reference
Not stated
Export MPAN
1620000382023
Import MPAN
1620000382023
Last updated
6 Dec 2021
Tracked since
May 2026 edition

Change history

Tracked since the May 2026 edition, across 3 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at WASHWAY FARM GSP / KIRKBY GSP GROUP

GSP view

17 other sites at this grid supply point in the October 2026 edition, 1 of them at PIMBO, the same primary substation. In all, the sites here total 278 MW: 132 MW connected, 146 MW accepted to connect.

  • YEW TREE DAIRYAGREN POWER AND ENERGY LTD, Other or not stated, PIMBO primaryAccepted2.48 MW
  • ORRELL BESSUKGEA 1 LIMITED, StorageAccepted70 MW
  • ORRELL BESSCORIOLIS ENERGY, StorageAccepted52.526 MW
  • STEELPOINT BESSAMBER ENERGY STORAGE XL LIMITED, StorageConnected49.9 MW
  • PIMBO ROADPIMBO GENERATION LIMITED, Gas and other fossilConnected21.052 MW
  • STANLEY WAY GENERATIONMY POWER UK, Gas and other fossil, SKELMERSDALE primaryConnected20.28 MW
  • SEFTON RDHERO FUTURE ENERGIES GLOBAL LIMITED, StorageAccepted20 MW
  • BLAGUEGATE WORKSUTILITY ENGINEERING SOLUTIONS LTD, Gas and other fossil, SKELMERSDALE primaryConnected7.952 MW

See all 17

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?