QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

HYNDBURN WINDFARM EXTENSION

ENERGY CONTOUR at PENWORTHAM EAST GSP / ROCHDALE SGT 1 GROUP

ENWL Embedded Capacity Register 2 – 1MW and above, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not stated
Status
Accepted to connect
Customer
ENERGY CONTOUR
Site name
HYNDBURN WINDFARM EXTENSION
Address
HASLINGDON OLD ROAD, OSWALDTWISTLE, BLACKBURN, LANCASHIRE, BB5 3RP
Grid reference
Easting 373431, northing 425450
Licence area
North West England (ENWL)
Grid supply point
PENWORTHAM EAST GSP / ROCHDALE SGT 1 GROUP
Bulk supply point
BLACKBURN
Primary substation
Not stated
Connection voltage
33 kV
Technology group
Wind
Energy source 1
WIND, ONSHORE WIND TURBINES: 8.2 MW registered
Registered capacity
8.632 MW
Maximum export capacity
0 MW
Maximum import capacity
0 MW
Change to maximum export capacity
8.2 MW
Change to maximum import capacity
0 MW
Flexible connection
No
In a connection queue
Not stated
Date accepted
28 Oct 2013
Date connected
Not stated
Distribution reinforcement reference
Not published by ENWL
Transmission reinforcement reference
Not stated
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
14 Mar 2024
Tracked since
May 2026 edition

Change history

Tracked since the May 2026 edition, across 2 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at PENWORTHAM EAST GSP / ROCHDALE SGT 1 GROUP

GSP view

30 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 460 MW: 317 MW connected, 143 MW accepted to connect.

See all 30

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose