CHRISTIES BESS
CHRISTIES HOSPITAL at SOUTH MANCHESTER GSP
ENWL Embedded Capacity Register 2 – 1MW and above, October 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- Not stated
- Status
- Accepted to connect
- Customer
- CHRISTIES HOSPITAL
- Site name
- CHRISTIES BESS
- Address
- THE CHRISTIE, COTTON LANE, WITHINGTON, STOCKPORT, M20 4QE
- Grid reference
- Easting 385236, northing 392482
- Licence area
- North West England (ENWL)
- Grid supply point
- SOUTH MANCHESTER GSP
- Bulk supply point
- WEST DIDSBURY
- Primary substation
- CHRISTIE PRIMARY
- Connection voltage
- 6.6 kV
- Technology group
- Storage
- Energy source 1
- STORED ENERGY (ALL STORED ENERGY IRRESPECTVE OF THE ORIGINAL ENERGY SOURCE), STORAGE - ELECTROCHEMICAL (BATTERIES): 2.5 MW registered
- Registered capacity
- 2.5 MW
- Maximum export capacity
- 0 MW
- Maximum import capacity
- 0 MW
- Change to maximum export capacity
- 2.5 MW
- Change to maximum import capacity
- 2.5 MW
- Flexible connection
- No
- In a connection queue
- No
- Date accepted
- 16 Feb 2022
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by ENWL
- Transmission reinforcement reference
- Not stated
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 7 Mar 2022
- Tracked since
- May 2026 edition
What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?
Change history
Tracked since the May 2026 edition, across 3 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at SOUTH MANCHESTER GSP
GSP view21 other sites at this grid supply point in the October 2026 edition, 1 of them at CHRISTIE PRIMARY, the same primary substation. In all, the sites here total 541 MW: 99 MW connected, 442 MW accepted to connect.
- CHRISTIE'S HOSPITAL ENERGY CENTRECHRISTIE NHS FOUNDATION TRUST, Gas and other fossil, CHRISTIE PRIMARY primaryAccepted2.7 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?