Distribution / Sites / Customer

Voltalia UK Limited

Customer named in the DNOs’ registers

In UKPN’s November 2026 and NGED’s August 2026 editions

The registers spell this customer’s name more than one way: “Voltalia UK Limited” (2 sites), “Voltalia uk limited” (1 site) and “Voltalia uk ltd” (1 site).

4sites of 1 MW and over
178 MWcapacity
32 MWconnected (1 site)
146 MWaccepted to connect (3 sites)

Capacity by DNO

DNOEditionSitesCapacityConnectedAccepted to connect
UKPNNovember 2026 edition2106 MW–106 MW
NGEDAugust 2026 edition272.6 MW32 MW40.6 MW

Capacity by technology

TechnologySitesCapacityConnectedAccepted to connect
Solar3146 MW–146 MW
Storage132 MW32 MW–

Each site is grouped by its first energy source, as the register names it.

Sites

Each site under this name in the DNOs’ latest editions, the largest first.

Site, company and substation names are shown as they appear in the registers, including capitalisation.

SiteDNOGrid supply pointTechnologyStatusMW
(ANM) Abbotsley RoadUKPNBurwellSolarAccepted to connect65
Pitstock FarmUKPNKemsleySolarAccepted to connect40.8
Land off a5/kilsby roadNGEDCoventry 132Kv S StnSolarAccepted to connect40.6
Hallen industrial park severn road avonmouth bristolNGEDIron Acton SgpStorageConnected32

Grid supply points

Each grid supply point its sites are at, with the capacity of its own sites there.

Grid supply pointDNOSitesConnectedAccepted to connect
BurwellUKPN1–65 MW
KemsleyUKPN1–40.8 MW
Coventry 132Kv S StnNGED1–40.6 MW
Iron Acton 132Kv S StnNGED132 MW–

What changed recently

Changes to its sites found in both editions of each pair, newest first.

UKPN, October 2026 edition to November 2026 edition, for this customer’s sites: 2 sites matched. Every October site and every November site had a match in the other edition.

Tracking NGED’s register since its August 2026 edition. Changes will show from its next edition.

  • (ANM) Abbotsley RoadUKPN, November 2026 editionTarget energisation date moved from 31 Oct 2028 to 31 Oct 2031 (36 months later)
QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my projectSee use cases

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?