Distribution / Sites / Customer

Uk capacity reserve limited

Customer named in the DNOs' registers

In NGED's August 2026 and Northern Powergrid's September 2026 editions

The registers spell this customer’s name more than one way: “Uk capacity reserve limited” (6 sites) and “UK Capacity Reserve” (1 site).

7sites of 1 MW and over
130 MWcapacity
130 MWconnected (7 sites)
–accepted to connect (0 sites)

Capacity by DNO

DNOEditionSitesCapacityConnectedAccepted to connect
NGEDAugust 2026 edition6106 MW106 MW–
Northern PowergridSeptember 2026 edition124 MW24 MW–

Capacity by technology

TechnologySitesCapacityConnectedAccepted to connect
Gas and other fossil7130 MW130 MW–

Each site is grouped by its first energy source, as the register names it.

Sites

Each site under this name in the DNOs' latest editions, the largest first.

Site, company and substation names are shown as they appear in the registers, including capitalisation.

SiteDNOGrid supply pointTechnologyStatusMW
UK Capacity ReserveNorthern PowergridGrimsby WestGas and other fossilConnected24
Hermitage laneNGEDChesterfield 132Kv S StnGas and other fossilConnected20.12
Nottingham road storNGEDRatcliffe On Soar 132Kv S StnGas and other fossilConnected20
Traston road stor, newportNGEDUskmouthGas and other fossilConnected20
Uk capacity reserve ltdNGEDPort Ham 132Kv S StnGas and other fossilConnected20
Tonypandy stor, off llwynpia roadNGEDUpper BoatGas and other fossilConnected18
Newport, docks way, newport np20 2nyNGEDUskmouthGas and other fossilConnected8

Grid supply points

Each grid supply point its sites are at, with the capacity of its own sites there.

Grid supply pointDNOSitesConnectedAccepted to connect
UskmouthNGED228 MW–
Grimsby WestNorthern Powergrid124 MW–
Chesterfield 132Kv S StnNGED120.1 MW–
Port Ham 132Kv S StnNGED120 MW–
Ratcliffe On Soar 132Kv S StnNGED120 MW–
Upper BoatNGED118 MW–

What changed recently

Changes to its sites found in both of two consecutive monthly editions of their DNO's register, the latest first.

NGED: QueueWatch holds one edition of its register so far, the August 2026 edition, so there is nothing to compare yet.

Northern Powergrid, August 2026 edition to September 2026 edition, for this customer's sites: 1 site matched. Every August site and every September site had a match in the other edition.

No change to the status, capacity, technology or customer of its sites in the editions QueueWatch holds.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose